Bandroom Improvements 2020- Project 1.

Project One involves removing /renewing the rotten outer & inner skins of the building from the store room door round to the kitchen door. Removing the interior wall between the back of the store room / back of bar creating an L shaped storage area which will then be fitted out with shelving (existing / new)  for all the spare instruments and equipment (leaving the main room much clearer). Finally a new wall will be built right across the back of the bar, which can then be decorated and equipped to suit our future requirements.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s